COMPLETED PROJECTS

▶ PROJECT 1

TITLE: Update of the Place Design Standard Manual.
CUSTOMER: ING BANK ŚLĄSKI SA.
LOCATION: Corporate branch network in Poland
DATE: December 2012 – April 2013
WEBSITE: www.ing.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Developing an update of the Place Design Standard Manual for ING Bank Śląski SA corporate organizational units.
The task was to develop an update of the standardization of comprehensive solutions for industry guidelines and interior image along with the annexation of branding elements of corporate banking.

RESPONSIBILITIES:
1. Development of an update of the Place Design Standard Manual for ING Bank Śląski SA corporate organizational units,
2. Updating product material metrics,
3. Updating and supplementing guidelines for industry projects,
4. Development of a collective illustrated list of elements and materials for the updated Manual of the Place Design Standard,
5. Generating a shortened version of the Manual of the Place Design Standard Little Manual,
6. Creating a current catalog with material samples of currently available and used materials,
7. Completing the library of elements in Auto CAD,
8. Making suggestions of typical spatial solutions for meeting rooms and offices,
9. Comprehensive coordination and ongoing verification of the implementation mode with the User and Industry.


▶ PROJECT 2

TITLE: Comprehensive interior designs.
CUSTOMER: ING BANK ŚLĄSKI SA.
LOCATION: Łódź, ul. Kopcińskiego 73/75, street: Malczewskiego 45 in Warsaw, ul. Zana 39 in Lublin, BOWID 38 in Chorzów, ul. Żeromskiego 40 in Radom / Poland
DATE: October 2010 – March 2012
WEBSITE: www.ing.pl
PROJECT STATUS: Completed.

RESPONSIBILITIES:
1. Interior measurement inventory,
2. Developing functional and spatial interior programs,
3. Making design decisions regarding material solutions and the way of conducting works,
4. Providing interior furnishings with the required sanitary, electrical and ventilation equipment – in consultation with the industry,
5. Making artistic and color decisions,
6, Selection or design of individual equipment and devices,
7. Designing of unusual equipment and finishing details with specification of the method of their implementation,
8. A comprehensive design of curvilinear walls with branding, carpet patterns and unusual furniture fittings – in consultation with the User,
9. Geometric guidelines for the reception desk design,
10. Layout of geometry of curvilinear walls with the location of Logo, Waiting Room and Coffee-Point,
11. Design of lining geometry,
12. Trapezoid table + setting options,
13. Furniture fittings for office supplies,
14. Guidelines for the industries: electricity, lighting, air conditioning.
15. Comprehensive coordination – author’s supervision and ongoing verification of the implementation mode with the User and Industry.
16. Coordination of the prototyping mode of unusual furniture assemblies,
17. Coordinating team work on complex multi-branch projects.


▶ PROJECT 3

TITLE: Interior design of network branches – project cooperation.
CUSTOMER: OPEN FINANCE
LOCATION: in Olsztyn, Bielsko Biała, Warsaw, Gdańsk, Gdynia, Lublin, Poznań and Szczecin
DATE: September 2007 – June 2009
WEBSITE: https://www.open.pl
PROJECT STATUS: Completed.

RESPONSIBILITIES:
1. Interior measurement inventory,
2. Developing functional and spatial interior programs,
3. Designing of unusual equipment and finishing details with specification of their implementation,
4. A comprehensive design of walls with branding, patterns of carpets and unusual furniture,
5. Design of lining geometry,
6. Furniture fittings for office supplies,
7. Guidelines for the industries: electricity, lighting, air conditioning.
8. Coordinating team work on complex multi-industry projects.


▶ PROJECT 4

TITLE: Interior design of network branches – project cooperation.
CUSTOMER: NOBLE BANK – PRIVATE BANKING
LOCATION: Warsaw ul. Domaniewska, Plac Piłsudskiego / Poland
DATE: September 2008 – June 2009
WEBSITE: https://www.noblebank.pl
PROJECT STATUS: Completed.

RESPONSIBILITIES:
1. Interior measurement inventory,
2. Developing functional and spatial interior programs,
3. Designing of unusual equipment and finishing details with specification of their implementation,
4. A comprehensive design of walls with branding, patterns of carpets and unusual furniture,
5. Design of lining geometry,
6. Furniture fittings for office supplies,
7. Guidelines for the industries: electricity, lighting, air conditioning.
8. Coordinating team work on complex multi-industry projects.


▶ PROJECT 5

TITLE: Interior design of network branches – project cooperation.
CUSTOMER: ALIOR BANK – PRIVATE BANKING
LOCATION: ul. Szyperska 14 in Poznań, Krakowskie Centrum Biurowe ETIUDA at ul. Pilotów 2 in Kraków, Aleje Jerozolimskie in Warsaw / PL
DATE: September 2009 – June 2010
WEBSITE: https://www.aliorbank.pl
PROJECT STATUS: Completed.

RESPONSIBILITIES:
1. Interior measurement inventory,
2. Developing functional and spatial interior programs,
3. Designing of unusual equipment, furniture and finishing details with specification of how they are made,
4. Designing unusual furniture constructions for office supplies,
5. Author’s supervision.


▶ PROJECT 6

TITLE: Designs of unusual furniture – cooperation on the project.
CUSTOMER: ITI MULTIKINO
LOCATION: ul. Wiertnicza w Warszawie / PL
Date: 2009
PROJECT STATUS: Completed.

RESPONSIBILITIES:
1. Interior measurement inventory,
3. Designing of unusual equipment, furniture and finishing details with specification of how they are made,
4. Designing unusual furniture constructions for office supplies,
5. Coordination of implementation.


▶ PROJECT 7

TITLE: Interior design of a hair styling salon.
CLIENT: KOSOWSKI HAIRDRESS STUDIO
LOCATION: Czarnieckiego 13A, 14-100 Ostróda / Poland
DATE: April 2018 – April 2019
WEBSITE: www.facebook.com/kosowskidesign.studiofryzur
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
The subject of the study was to create a multi-functional, modern and subdued interior design and visual identity of the living room – KOSOWSKI STUDIO FRYZUR.
In agreement with the Investor, the author of the project – Adam Korulczyk adopted a simultaneous, i.e. multidirectional and centralized design focus consisting in adapting technological guidelines to the Investor’s form of activity in correlation with precisely defined functionality, ergonomics of working, communication and commercial and exhibition zones.

RESPONSIBILITIES:
The initial stages consisted in precise definition of industry guidelines: electricity, lighting, water and sewage. – according to the Sanitary and Investor guidelines.
In the next stage, the author of the project focused on developing the identification image codification of the KOSOWSKI STUDIO FRYZUR brand consisting in creating a modular geometric system based on the initial form of the first letters contained in the salon name: K.S.F.
These letters are composed in the following zones: logo, large-format graphics in the reception, raster walls separating the visage zone from the hair styling zone, site foiling and internal visual identification system.
The next stage consisted in the even selection and distribution of technological and industry equipment as well as finishing materials on floors, furniture and walls. The use of mirrors created the effect of increasing the space of the living room and the reflection of daylight.
The whole interior of the living room is enclosed in a stylistically coherent cubist character, based on rectangular forms. this is visible in the armchair line, reception desk, laboratory furniture zone, font in the logo and identification elements, openwork spatial letters in openwork walls and window veneers.


▶ PROJECT 8

TITLE: Development of the project of the image of the facade lighting of the building and the style of the gate passage.
CUSTOMER: SŁUŻEW NAD DOLINKĄ
LOCATION: Warsaw, ul. Sonatas / Poland
DATE: January 2017 – March 2017
WEBSITE: www.smsnd.pl
PROJECT STATUS: In progress.

DESIGN ASSUMPTIONS:
Creating an attractive image of the apartment building facade – using geometric lighting systems in correlation with innovative facade lighting technology and adjacent space.

RESPONSIBILITIES:
1. Development of computer visualizations of the north-west facade along with a proposal for the lighting style of the building,
2. Technical design with the location of the lighting,
3. Electronic presentation in PDF format with specification of finishing and lighting elements together with descriptions.


▶ PROJECT 9

TITLE: Development of the project of the image of the spectacular geometry of the facade of the newly designed building.
CUSTOMER: SŁUŻEW NAD DOLINKĄ
LOCATION: Warsaw, ul. Puławska / Wałbrzyska / Poland
DATE: October 2016 – December 2016
WEBSITE: www.smsnd.pl
PROJECT STATUS: In progress.

DESIGN ASSUMPTIONS:
The design assumption of the facade lighting of the newly designed building at Puławska Street at the corner of Wałbrzyska in Warsaw is to obtain the hallmarks of a spectacular and futuristic image of the facade’s night lighting.

RESPONSIBILITIES:
The owner and designer of KLD STUDIO – Adam Korulczyk created a golden-balanced algorithm consisting in the imposition of a grid of two light lines in trapezoidal geometry wrapping the structure of all priority facades. For the acquired light effect he used auxiliary luminaires subtly illuminating facade niches, and warning type lighting – aviation. The diagonal color division of the façade in the form of light and dark gray colors generated the effect of architectural deconstructivism – breaking the geometrical laws of gravity – at the same time „breaking” the typical image and cubature principles of buildings.


▶ PROJECT 10

TITLE: Visual identity designs for a sports federation.
CLIENT: POLISH AIKIDO GROUP
LOCATION: Dojo Giżycko ul. Mickiewicza 33a / Poland
DATE: September 2018 – Present
WEBSITE: www.pgaikido.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive layout of printed layouts and printed materials for the POLSKA GROUP AIKIDO GROUP.

RESPONSIBILITIES:
1. Graphic design of the federation logotype,
2. Designs of advertising banners for social networking sites,
3. Graphic designs of federation certificates and ID,
4. Graphic design of the website layout.


▶ PROJECT 11

TITLE: Visual identity designs for restaurants in Masuria.
CUSTOMER: RESTAURANT – RUG
LOCATION: Ukta 68, 12-220 Ukta / Poland
DATE: September 2017 – Present
WEBSITE: https://pl-pl.facebook.com/ukta.glowna
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for electronic layouts and printed materials.

RESPONSIBILITIES:
1. Graphic design of the restaurant’s logotype,
2. Designs of advertising banners for social networking sites,
3. Graphic designs of company printed materials: letterhead, business cards, stickers, rollups, signboards, leaflets, external banners, t-shirt,
4. Graphic design of the website layout.


▶ PROJECT 12

TITLE: Logotype designs for CASHBACK CARD Olsztyn, Dobre Miasto, Kwidzyn.
CUSTOMER: CASHBACK CARD
LOCATION: Olsztyn, Dobre Miasto, Kwidzyn / Poland
DATE: December 2016 – February 2017
WEBSITE: https://pl-pl.facebook.com/olsztyncashbackcard/
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for electronic layouts and printed materials.

RESPONSIBILITIES:
Graphic design of CASHBACK CARD logotypes Olsztyn, Dobre Miasto, Kwidzyn.


▶ PROJECT 13

TITLE: Graphic designs and comprehensive development of the Book of Visual Identification.
CUSTOMER: POCIECHOM FOUNDATION
LOCATION: Wybrzeże Puckie 2, 03-301 Warsaw / Poland
DATE: October 2012 – Present
WEBSITE: www.pociechom.org.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for electronic and printed materials.

RESPONSIBILITIES:
1. Graphic identification of the foundation’s logo,
2. Comprehensive development of the Book of Visual Identity containing all the basic graphic guidelines of office, marketing and social materials, object marking, vehicles, gadgets, invitations, posters, letterhead, business cards, A4 folders, identifiers, banners, rollup, layout of websites.


▶ PROJECT 14

TITLE: Development of graphics for the exhibition stand.
CUSTOMER: SŁUŻEW NAD DOLINKĄ
LOCATION: Warsaw, Palace of Culture and Science / Poland
DATE: September 2011
WEBSITE: www.smsnd.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Precise graphic definition of sales products of the exhibition stand.

RESPONSIBILITIES:
1. Restyling 3D visualization of the development investment at ul. Elsner in Warsaw,
2. Development of graphic layouts and identification style of the exhibition stand during the housing fair.
3. Preparation of graphic exhibition materials for printing and multimedia presentation.


▶ PROJECT 15

TITLE: Visual identification projects.
CUSTOMER: AIKIDO TRADITION TRAVELING UNIVERSITY
LOCATION: 12-220 Ukta 72 lok. 2 / Poland
DATE: September 2017 – Present
WEBSITE: https://pl-pl.facebook.com/roninukta/
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for electronic layouts and printed materials.

RESPONSIBILITIES:
1. Graphic design of the University logotype,
2. Designs of advertising banners for social networking sites,
3. Graphic designs of company printed materials: letterhead, business cards, stickers, rollups, signboards, leaflets, external banners, t-shirt.


▶ PROJECT 16

TITLE: Interior design and visual identification.
CUSTOMER: CITY HOSPITAL ST. WINCENTEGO A PAULO – HOSPITAL RESCUE DEPARTMENT
LOCATION: Wójta Radtkego 1, 81-348 Gdynia / Poland
DATE: 2006
WEBSITE: http://www.szpitalepomorskie.eu
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Design and image support of the interior and visual identification system.

RESPONSIBILITIES:
1. Graphic designs of the area identification system,
2. Graphic designs of external information signs,
3. Selection of finishing materials,
4. Designs of unusual furniture for reception, office and treatment rooms,
5. Marking out the location of wall protection systems and fenders,
6. Performing wall paintings in the technique of dry pastels on a maritime theme,
7. Comprehensive coordination and ongoing verification of the implementation mode with the User and the General Contractor.


▶ PROJECT 17

TITLE: Visual identity designs for the Scandinavian company Legalett.
CUSTOMER: LEGALETT
LOCATION: Al. Grunwaldzka 487A, 80-309 Gdańsk / Poland
DATE: March 2004 – August 2006
WEBSITE: https://www.legalett.com.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for electronic layouts and printed materials.

RESPONSIBILITIES:

1. Development of spatial graphics for marketing materials,
1. Graphic processing of photographic materials,
3. Graphic design of the advertising brochure,
4. Design and implementation of an animated multimedia presentation,
5. Graphic designs for company website layouts.


▶ PROJECT 18

TITLE: Visual identification projects for the Tri-City Technik Walk technician.
CUSTOMER: MARTIAL ARTS ACADEMY
LOCATION: Antoniego Lendziona 6, 80-001 Gdańsk / Poland
DATE: November 1999 – June 2006
WEBSITE: www.atw.pl
PROJECT STATUS: Completed.

DESIGN ASSUMPTIONS:
Graphic design and image support – developing a comprehensive graphic design for printed materials.

RESPONSIBILITIES:

1. Graphic development of printed marketing materials; leaflets, posters, banners, business cards,
2. Design and implementation of external advertising banners.